151st Street Pedestrian Bridge
| LOCATION: |
Fort Washington Park, New York, NY |
| CLIENT: |
NYSDOT |
| CONSTR. COST: |
$16,000,000 |
| TYPE OF WORK: |
Design and Construction Support Services |
DESCRIPTION: BLA is currently designing the New York City “Signature Bridge” for the west side of Manhattan. During Preliminary Design, BLA studied alternatives, developed landscaping and architectural treatments, performed environmental studies including a NEPA checklist, cultural resources, hazardous waste/contaminated materials screening and asbestos assessment.
|
|
|
|
Next >>
|
|
158st Street Pedestrian Ramp Access
| LOCATION: |
Fort Washington Park, New York, NY |
| CLIENT: |
NYSDOT |
| CONSTR. COST: |
$2,500,000 |
| TYPE OF WORK: |
Design and Construction Support Services |
DESCRIPTION: During Preliminary Design, BLA studied alternatives and developed landscaping and architectural treatments. BLA assisted NYSDOT in the preparation of a Scope Summary Memorandum, and progressed the selected alternative through Final Design. The review process included public information meetings and presentations to the NYC Department of Parks and Recreation, the NYC Landmarks Commission and the NYC Arts Commission.
|
|
|
<< Previous
|
Next >>
|
|
Bronx River Parkway Bridges
| LOCATION: |
White Plains, NY |
| CLIENT: |
Westchester County DPW |
| CONSTR. COST: |
$2,000,000 |
| TYPE OF WORK: |
Design&Constr. Support Services |
DESCRIPTION: This project includes the preparation of plans, specifications and construction cost estimates for the widening of the three bridges carrying the Bronx River Parkway over the Bronx River. These single-span bridges will be widened from 45 feet to 65 feet. Two of the bridges are pre-stressed beam superstructures with conventional concrete substructures; the third is a concrete arch bridge. BLA will also prepare bridge sections showing the construction staging required to maintain parkway traffic.
|
|
|
<< Previous
|
Next >>
|
|
Interim Rehabilitation of the Henry Hudson Parkway Viaduct
| LOCATION: |
New York, NY |
| CLIENT: |
NYSDOT |
| CONSTR. COST: |
$30,000,000 |
| TYPE OF WORK: |
Bridge Inspection and Rehabilitation Design |
DESCRIPTION: BLA is in the process of providing Phases I-VI design services; project tasks will include survey and environmental assessment, detailed inspection of the viaduct, preparation of an inspection report, development of design recommendations, preparation of a scope summary memorandum/design report, preliminary & final design, and construction support.
|
|
|
<< Previous
|
Next >>
|
|
Brooklyn-Queens Expressway (I-278) Interim Rehabilitation
| LOCATION: |
Kings County, New York, NY |
| CLIENT: |
NYSDOT |
| CONSTR. COST: |
$139,000,000 |
| TYPE OF WORK: |
Bridge Inspection and Rehabilitation Design |
DESCRIPTION: BLA was retained by New York State Department of Transportation to provide preliminary and final design services for the rehabilitation of the Park Avenue Viaduct, a 70-span, 1,402-meter structure; the Tillary Street entrance ramp, a four-span, 73-meter structure; and the Nassau Concord Viaduct, a six-span, 200-meter structure.
|
|
|
<< Previous
|
|
|